3. Construction section

The third section of the building deals with the interior of the church. It can be safely assumed that after the renovation of the ceiling in the second stage of construction, the surrounding stucco will have been affected and a basic restoration will be needed.

All the windows are from the start-up period around 1863. They now require a basic renovation. Besides further storage and maintenance work, the floor as well as the doors have to be restaurated.

For this last phase of construction, € 295,000 have been budgeted for 2016.